Figure 1.

Figure 1.

Figure 1. Drill hole locations – AntaKori Project. Location of the current drilling along southern margin of Regulus concessions. Section lines L450NW, L650NW and L800NW that are shown in Figures 2-4. A full set of sections lines for drilling reported to date is available on the Regulus website – www.regulusresource.com

Format

JPEG

Source

Regulus Resources Inc

Downloads