Pershing Resources Receives Updated NI 43-101 Technical Report On Its New Enterprise Project


The Company’s Geologic Consulting Team Outlines A Potential Gold/Copper Porphyry

RENO, Nev., June 20, 2018 (GLOBE NEWSWIRE) --  Pershing Resources Company, Inc., (OTC PINK:PSGR), is pleased to announce grab sample assay data and the issuance of a 43-101 technical report for its 100% owned New Enterprise Project located in the Maynard Mining District near Kingman, Arizona. The most important feature of this work is the newly identified potential for gold-copper porphyry mineralization within the Project area. Further exploration work is highly recommended, and the Project is considered to have an excellent potential to include a significant mineral resource.

Bedrock outcropping of high-grade precious and base metal veins and relatively lower grade porphyry copper-molybdenum mineralization was previously known to occur within the New Enterprise Project. Newly acquired preliminary geological, structural, and analytical results of these occurrences suggest the presence of overlapping styles (“telescopic”) of alteration and mineralization. “Telescopic” alteration and mineralization are present within extensive, and recurring, north-south oriented vertical to sub-vertical vein systems. This is significant because zonation about a porphyry copper-molybdenum system is typically outward from the core of the porphyry; as described in the Mineral Park porphyry copper-molybdenum deposit located approximately 20 miles to the northwest. One possible explanation being considered for the overlapping “telescopic” system of alteration and mineralization is that the vein systems are situated directly over a “buried” gold-copper porphyry system.

At least three vein systems, generally referred to as Central, West, and East, have been identified spanning an area approximately 1.2 by 0.9 miles (2.0 by 1.4 kilometers), entirely within the New Enterprise Project. The host rock to the vein systems include relatively older rocks that may be a “roof” overlying a potentially buried porphyry system. “Roof” rocks would act as a cap, trapping and focusing mineralization into vein systems and potentially along its base which has yet to be determined within the Project area. This process is not unusual for gold-copper porphyry systems but involves the application of a slightly different exploration model than the standard porphyry copper-molybdenum exploration model. Combined with the lack of modern exploration work completed within the New Enterprise Project, gold-copper porphyry mineral resource potential is considered to have never been tested for the Project area.

The Central Vein System can be traced in intermittent outcrop for a minimum of 1.2 miles (2 kilometers) with a width in places up to 33 yards (30 metres). Grab sample assays of gold range from 0.00 to 9.89 grams per tonne and copper range from 28 ppm to 1.42%. The West Vein System, which has garnered less historical attention, appears to consist of a conjugate vein system 22 to 55 yards (20 to 50 metres) wide, with additional occurrences spanning a distance of up to 190 yards (175 meters), along a strike of at least 185 yards long (170 meters). Grab sample assays of gold range from 0.04 to 35.30 grams per tonne gold and copper range from 33 ppm to 1.02%. The East Vein System is poorly exposed and recent grab sample results did not report values as high as those reported from the Central and West Vein Systems. Grab sample assays of gold range from 0.01 to 0.13 grams per tonne and copper range from 99 to 162 ppm. The base of the proposed “roof” was not identified during the previous program and may only be identified with subsurface drilling.

The vein systems are currently being described as a composite of, from oldest to youngest, porphyry intrusions, early quartz veining, intense alteration, and late quartz veining. The most important significance of these results is a demonstration that the vein systems include multiple generations of precious and base metal mineralization that has never been drill tested. A common first impression of the high-grade silver, lead, zinc mineralization is that they are not wide enough or continuous enough to make-up sufficient tonnage to be considered a mineral resource. The results of the recent grab samples suggest the potential of additional precious and base metal mineralization within the vein systems along with the high-grade veins; providing a more continuous source of mineralization within and along the veins. Drilling will be required to determine the potential grade and tonnage of the vein systems.

The 43-101 technical report highly recommends further work that includes, but not limited to, airborne geophysics, geological mapping and sampling, and diamond drilling. Initial bedrock sampling is currently underway. Geophysics and diamond drilling will commence immediately after the securing of sufficient funds to complete the work.

Pershing Resources' CEO, Steve Plumb, stated, “We are pleased that the recent data and 43-101 Technical Report further substantiate Pershing Resources assertion that the New Enterprise Project is an excellent mineral exploration property. Positive feedback from ongoing work motivated us to substantially expand the land package to capture the full potential of the Project area. We are very excited to move forward with an aggressive exploration program in 2018.”

All bedrock grab sample collection, analysis, and interpretation were completed by Professional Geoscientists independent of Pershing Resources. Analysis were completed by ALS Laboratories, USA Inc. with an accredited and certified standard quality assurance and quality control methods and procedures as outlined on their webpage www.alsglobal.com. As part of Pershing Resources quality control program, ten pulp duplicates were analyzed. All quality assurance, quality control, and sample security work met expectations for their intended purposes.

The technical content of this press release has been reviewed and/or prepared by Edward C. Walker, Ph.D., P.Geo., an independent consultant as defined by National Instrument 43-101.

For more information and an electronic copy of the 43-101 technical report, please visit Pershing Resources website at: https://www.pershingpm.com/projects/the-new-enterprise-project/technical-report  

About Pershing Resources

Pershing Resources is a precious and base metals exploration and mining company with several projects in North America. The Company is based in Reno, Nevada and owns an operations facility near Kingman, Arizona. It is currently focused on the development of it's 100% owned New Enterprise and Mohave-Standard properties, collectively referred to as the New Enterprise project. The New Enterprise Project is located between the Mineral Park Porphyry Cu-Mo mine (approximately 20 miles to the northwest) and the Baghdad Cu-Mo mine (approximately 45 miles to the southeast). The Company's other assets are comprised of mining properties in various stages of development located in the Western United States.

As opportunities arise, the Company will seek to strengthen its balance sheet through acquisition of additional mineral rights and mining properties. Pershing Resources is committed to responsible mining practices and, we believe, is positioned to deliver sustained growth and performance for years to come.

Forward-Looking Statements

The information contained in this press release as well as the information on the Company's website is provided solely for the reader's general knowledge. Such information is not intended to be a comprehensive review of all matters pertaining to the Company. Certain statements included herein and on the Company's website, constitute "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995. Forward looking statements reflect management's current knowledge, assumptions, judgment and expectations regarding future performance or events. Although management believes that the expectations reflected in such statements are reasonable, these forward-looking statements are based on the beliefs of, assumptions made by, and information currently available to the Company's management. When used in this press release and on the Company's website, the words "estimate," "project," "believe," "anticipate," "intend," "expect," and similar expressions are intended to identify forward-looking statements. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause the actual results, performance and/or achievements of the Company or of the gold mining industry in general to be materially different from future results, performance and/or achievements expressed or implied by those forward-looking statements. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations include uncertainties related to fluctuations in gold, silver and other commodity prices, uncertainties relating to interpretation of drill results and the geology of the Company's properties, uncertainty of estimates of capital and operating costs, the need for cooperation of government agencies in the development of the Company's mineral projects, the need to obtain additional financing to develop the Company's mineral projects, the possibility of delay in development programs or in construction projects, and uncertainty of meeting anticipated program milestones for the Company's mineral projects.

All forward-looking statements are expressly qualified in their entirety by this cautionary notice. Readers are cautioned not to place undue reliance on any forward-looking statements, which speak only as of the date of this release. The Company has no obligation, and expressly disclaims any obligation, to update, revise or correct any of the forward-looking statements, whether as a result of new information, future events or otherwise.

Source: Pershing Resources Company, Inc.

Surface Sampling Program January 2018           
JANUARY 2018 SAMPLING PROGRAM               
PROJECT : "NEW ENTERPRISE"               
 Au-ICP21ME-MS61ME-MS61ME-MS61ME-MS61ME-MS61ME-MS61ME-MS61ME-MS61ME-MS61ME-MS61ME-MS61ME-MS61ME-MS61ME-MS61
SAMPLEAuBiTeAgAsSbCuPbZnMoFeSKMgTi
Numberppmppmppmppmppmppmppmppmppmppm%%%%%
X0434010.125033513 99 27 63.10.83.60.800.23
X0434020.12802647611 79 135 116.30.31.60.360.04
X0434030.0101008336 65 135 73.51.63.40.770.38
X0434040.02436050121 20 62 8512.70.10.60.050.01
X0434050.0103216013 13 12 104.10.10.70.070.02
X0434060.0468634130 45 27 65.00.72.90.230.59
X0434070.1761814471172260 1.90%286 355.90.30.00.010.01
X0434080.19813211240 254 54 31.60.00.10.020.01
X0434091.220320731811154504 2160 148 1264.00.40.40.050.04
X0434100.348372043105 296 102 92.30.00.20.020.01
X0434110.01452371315 142 405 13.40.64.80.600.43
X0434120.04458435191 288 87 43.71.44.80.650.38
X0434130.13515323201094283 2730 115 177.22.11.70.190.12
X0434143.04031052161120101285 5030 690 159.40.50.40.050.01
X0434159.890596237645299215740 6580 2980 11531.00.40.30.070.01
X0434160.092311183334 849 1410 151.00.31.80.250.22
X0434170.019313201285 204 291 102.61.24.80.520.33
X0434181.0301324755963711675 6710 845 689.61.10.50.080.02
X0434190.3044712101406541 741 761 273.70.30.40.060.02
X0434200.3471532218442150 3000 2070 125.31.73.30.380.16
X0434210.13430216962636 1540 1140 82.10.40.80.080.03
X0434220.032202112243 110 214 30.90.25.10.520.38
X0434230.05331521251255 429 1880 255.11.74.90.540.29
X0434240.07131872455724 2220 1810 688.91.31.00.090.03
X0434250.044931412781.42%507 3870 622.11.34.10.380.25
X0434260.00310120201 15 105 212.80.02.50.830.22
X0434270.0011001087 19 19 861.50.23.80.100.18
X043428<0.0010001043 39 37 61.80.05.40.180.31
X0434290.512012174742510 2.84%1580 64.90.72.60.440.34
X0434300.22542163192100 1.49%765 54.90.90.80.120.10
X0434318.32011251943401013050 1.06%514 127.91.70.50.030.02
X04343235.300438119283284870 5.05%839 1311.82.51.10.120.06
X0434330.18410111521.02%2470 6720 35.40.05.80.970.67
X0434340.0430021224830 1.11%4690 111.80.34.30.550.23
X0434350.067002111951 988 4420 25.30.05.51.020.52
X0434361.6252416325235 3850 232 72.30.40.40.050.02
X0434370.314521412133 530 70 92.60.74.40.690.41
X0434380.37333810167 677 228 112.10.44.20.680.38
X0434390.293537422694 1030 868 263.30.10.80.150.06
X0434400.0554411612220 478 270 295.01.14.70.340.14
X0434410.026011841110 68 214 21.20.00.10.020.01
X0434420.018003532847 269 2010 25.10.35.30.740.40
X0434430.0906414301544 742 575 43.90.54.60.680.35
X0434440.07361012303808 2440 248 224.21.43.90.380.25
X0434450.18347441031370 3030 120 153.30.40.40.030.02
X0434460.327201043235137140 3.38%543 94.30.70.10.01<0.005
X0434470.477471179250211.31%9.20%404 75.81.40.10.01<0.005
X0434480.9667638205118 989 19 41.20.10.20.030.01
X0434490.1989921587829158 1655 79 182.10.40.30.040.20
X0434500.5955106322648958810 3150 143 213.80.30.10.010.01
X0432010.161981849834207 1265 102 121.40.44.50.300.21
X0432020.042214212388 422 658 23.50.34.90.250.25
X0432030.0020004228 33 5310 01.70.04.10.280.22
X0432040.118931520796 524 266 303.00.10.40.060.03
X0432050.647106204216258217 601 387 95.20.10.20.030.02
X0432060.060426716133 106 119 32.40.46.10.580.31
X0432070.07514498712107 1350 104 43.30.74.40.690.28
X0432080.003001621580 182 298 33.90.25.10.290.50
X0432090.008001182152 145 248 21.20.53.30.450.41
X0432101.280167551062710474180 3.29%333 5814.14.62.50.090.06
X0432110.0411611552612890 3280 1200 76.93.04.80.400.27
X0432120.0270152931170 397 961 34.30.45.60.250.38
X0432130.0321361023349 1330 203 23.20.95.50.350.47
X0432140.896153780805169 591 145 72.40.50.50.060.02
X0432151.1606371474925455 494 431 91.60.50.20.030.02
X0432160.06937514617464 441 169 114.90.33.10.420.24
X0432170.5306234245146 1705 83 122.50.50.20.010.01
X0432180.39861128979102260 2380 1220 35.96.40.30.030.01
X0432190.028102464184 57 353 12.31.25.50.400.31
X0432200.1083148339 748 103 101.20.60.30.040.01
X0432210.10736528281142470 2000 2.71%127.82.30.20.060.01
X0432220.05521210222 248 231 74.30.11.60.260.13
X0432230.0551127120 90 74 32.60.13.60.630.29
X0432240.0501136375 162 117 65.10.12.10.330.10
X0432250.013122656 27 36 02.00.34.50.460.45
X0432260.0131211010 21 45 12.60.44.80.630.40
X0432270.0832237118 195 21 123.10.91.10.120.20
X0432280.0392343130 36 21 22.60.14.80.140.36
X0432290.04303101112 15 11 31.10.00.30.030.03
X0432300.1331133210 13 6 31.50.10.20.030.01
X0432310.050253419 41 18 64.41.45.50.250.44
X0432320.02472132089413 221 248 32.70.16.30.270.29
X0432330.185158484217299 2020 177 42.20.30.20.010.01
X0432340.0353121239216702 948 352 103.00.10.10.01<0.005
X0432350.0090006054 27 313 13.80.02.31.190.53
X0432360.221536182283 707 150 44.90.34.30.760.48
X0432370.008002111992 153 2510 26.70.03.70.810.56
X0432380.1946312381269 656 255 62.50.90.50.080.03
X0432390.117327361308 3830 200 123.20.42.60.360.20
X0432400.035312251195 24 722 62.50.14.50.200.17
X0432410.0291105046 30 434 22.90.05.60.140.39
X0432420.0941048188102850 981 4290 1618.80.31.10.160.08
X0432430.12547166574338 3370 325 294.61.01.00.070.05
X0432442.4005101403579620422860 4.21%336 2010.63.61.40.010.02
X0432453.0203410318924203134120 1.93%429 183.70.61.40.230.11
X0432460.07144252520301121590 757 667 1011.80.42.60.370.23
X0432470.1862319758168173 4470 208 43.41.04.00.570.30
X0432480.5563024971315603580 9850 368 106.30.40.40.070.03
X0432490.062483331114596 456 45 113.30.72.00.290.14
X0432500.06312333985185 571 142 112.70.11.20.210.11
X0432510.0160007142 28 147 63.50.03.41.010.50
X0432520.012111111108 56 2310 04.10.93.91.320.54
X0432530.236453120701997060 2.61%2.84%21.63.30.10.010.01
X0432540.039215353242 819 360 61.90.44.30.440.46
X0432550.07416125341643 1675 456 106.62.04.50.400.39
X0432562.45093652361480914090 1.83%397 42.00.90.10.010.01

Contact Data