G2 GOLDFIELDS PROVIDES OKO EXPLORATION UPDATE


NOT FOR DISTRIBUTION TO U.S. NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE U.S.

TORONTO, April 08, 2020 (GLOBE NEWSWIRE) -- G2 Goldfields Inc. (TSXV: GTWO) (the “Company” or “G2”) is pleased to provide an update on the Company’s ongoing drilling project at the Oko project, Guyana.  The 19,200-acre project contains multiple areas of gold mineralization, the most prominent of which include the Aremu Mine Zone and the Oko Deformation Zone (ODZ).  The ODZ has been subject to a drilling program which commenced in March 2019 whereas drilling in the Aremu Mine Zone is scheduled for Q3 2020.

The Oko area is characterized by multiple open-pits and shafts along a prominent 2 km long north-south trending deformation zone.  G2 has completed a total of 35 drill holes (6312m) to date, of which 16 (3313m) are pending assays.  Diamond drilling continues to strongly support the geological model developed in the later part of the 2019 drilling program, with visible gold (VG) intersected in each of the sixteen holes completed since mid-January.  All core intersections containing VG are being subject to metallic screening in order to account for the coarse nature of the gold.  The Company has constructed a photographic gallery of visible gold in core which is accessible by clicking here, or at the following link https://www.g2goldfields.com/core-gallery/

A plan view map of the drilling program at ODZ is available here, or at the following link https://www.g2goldfields.com/wp-content/uploads/2020/04/PlanViewMap.pdf

Additional Targets at Oko South

G2 also announces it has commenced a 10-hole (2000m) drilling program at a newly acquired property contiguous to, and approximately one kilometer south of, the area of recent drilling.  Initial reports from Oko south confirm similar styles of mineralization as encountered at ODZ as well as numerous open-pits and at least three vertical shafts.  Initial drilling will focus on areas with historical gold workings.

QA/QC

Drill core is logged and sampled in a secure core storage facility located on the Oko project site, Guyana. Core samples from the program are cut in half, using a diamond cutting saw, and are sent to MSALABS Guyana, in Georgetown, Guyana, which is an accredited mineral analysis laboratory, for analysis. Samples from sections of core with obvious gold mineralization are analyzed for total gold using an industry standard 500g metallic screen fire assay (MSALABS method MSC 550). All other samples are analysed for gold using standard Fire Assay-AA with atomic absorption finish (MSALABS method; FAS-121). Samples returning over 10.0 g/t gold are analyzed utilizing standard fire assay gravimetric methods (MSALABS method; FAS-425). Certified gold reference standards, blanks and field duplicates are routinely inserted into the sample stream, as part of G2 Goldfield’s quality control/quality assurance program (QAQC). No QA/QC issues were noted with the results reported herein.

About G2 Goldfields Inc.

G2 Goldfields Inc. is focused on the discovery of large gold deposits in the Guiana Shield.  The Company owns a 100% interest in two past gold producing mines, as well as a regional portfolio of highly prospective projects.

All scientific and technical information in this press release has been prepared under the supervision of Dan Noone (CEO of G2 Goldfields Inc.), a “qualified person” within the meaning of National Instrument 43-101. Mr. Noone (B.Sc. Geology, MBA) is a member of the Australian Institute of Geoscientists.

For further information please contact:
Dan Noone
CEO
+ 416.628.5904
Email: d.noone@g2goldfields.com

Forward Looking Statements

This news release contains certain forward-looking information and statements within the meaning of applicable securities laws. The use of any of the words “expect”, “anticipate”, “continue”, “estimate”, “may”, “might”, “will”, “project”, “should”, “believe”, “plans”, “intends” and similar expressions are intended to identify forward-looking information and/or statements.  Forward-looking statements and/or information are based on a number of material factors, expectations and/or assumptions of G2 Goldfields which have been used to develop such statements and/or information, but which may prove to be incorrect. Although G2 Goldfields believes that the expectations reflected in such forward-looking statements and/or information are reasonable, undue reliance should not be placed on forward-looking statements as G2 Goldfields can give no assurance that such expectations will prove to be correct. In addition to other factors and assumptions which may be identified herein assumptions have been made regarding, among other things: results from planned exploration and drilling activities; future plans for operational expenditures; the accuracy of the interpretations of exploration and drilling activity results; availability of financing to fund current and future plans and expenditures; the impact of increasing competition; the general stability of the economic and political environment in which G2 Goldfields has property interests; the general continuance of current industry conditions; aboriginal matters; the timely receipt of any required regulatory approvals; the ability of G2 Goldfields to obtain qualified staff, equipment and/or services in a timely and cost efficient manner; the ability of the operator of each project in which G2 Goldfields has property interests to operate in a safe, efficient and/or effective manner and to fulfill its respective obligations and current plans; future commodity prices; currency, exchange and/or interest rates; and the regulatory framework regarding royalties, taxes and/or environmental matters in the jurisdictions in which G2 Goldfields has property interests. The forward-looking information and statements included in this news release are not guarantees of future performance and should not be unduly relied upon. Such information and/or statements, including the assumptions made in respect thereof, involve known and unknown risks, uncertainties and other factors that may cause actual results and/or events to differ materially from those anticipated in such forward-looking information and/or statements including, without limitation: risks associated with the uncertainty of exploration results and estimates, currency fluctuations, the uncertainty of conducting operations under a foreign regime, exploration risk, the uncertainty of obtaining all applicable regulatory approvals, the availability of labour and/or equipment, the fluctuating prices of commodities, the availability of financing and dependence on the  management personnel of the Corporation, other participants in the property areas and/or certain other risks detailed from time-to-time in G2 Goldfields public disclosure documents (including, without limitation, those risks identified in this news release and G2 Goldfields current management’s discussion and analysis). Furthermore, the forward-looking statements contained in this news release are made as at the date of this news release and the Corporation does not undertake any obligations to publicly update and/or revise any of the included forward-looking statements, whether as a result of additional information, future events and/or otherwise, except as may be required by applicable securities laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy and / or accuracy of this release.