APPENDIX B: LP Fault zone long section

Great Bear Long Section Appendix B (July 31) Final

Composites generated from drill intersections received since the May 9, 2023, news release includes assays from 22 fully assayed and 1 partially assayed drill holes at the LP Fault zone and 2 at the Limb zone. Composites are generated using 0.3 g/t minimum grade, maximum linear internal dilution of 5.0 m, and allows short high-grade intervals greater than 8 GXM to be retained. Results are preliminary in nature and are subject to on-going QA/QC. For full list of significant, composited assay results, see Appendix A.

Format

JPEG

Source

Kinross Gold Corporation

Downloads