Figure 3: Target map with significant 4 m composite AC drill intercepts >0.1 g/t Au and AC and RC drilling completed in 2022

Figure 3: Target map with significant 4 m composite AC drill intercepts >0.1 g/t Au and AC and RC drilling completed in 2022

Figure 3: Target map with significant 4 m composite AC drill intercepts >0.1 g/t Au and AC and RC drilling completed in 2022

Format

JPEG

Source

Novo Resources Corp.

Downloads