Accessibility: Skip TopNav
Figure 2
Workover rig at the pre-existing production well in East Texas. This rig was used to re-perforate the existing production casing to allow brine sampling from various zones in the Smackover Formation.
Format
JPEG
Source
Standard Lithium
Downloads
Original
Large
Medium
Small