Table 1: Significant Exploration Drill Results at Rozino Gold Project

Table 1

The drill intersections disclosed here have not yet been included in a resource model and true thickness of mineralization has not yet been determined. Drill holes are designed to intersect mineralization perpendicular or close to perpendicular. Drill intersections are calculated using a 0.2 g/t gold trigger, a minimum 0.5 g/t gold composite, and a maximum of 3 metres consecutive waste. Results from RDD-177 were previously disclosed in news release dated May 26, 2020.

Format

PNG

Source

Velocity Minerals Ltd.

Downloads