Accessibility: Skip TopNav
Figure 7.
Plan section of the Central Zone – Lake Zone Link Drilling. Intercepts above 0.5 g/t Au when diluted to 1 m are denoted by dots. Drillholes are annotated with composites over 2.0 g/t Au when diluted to 1 m.
Format
PNG
Source
Mandalay Resources Corporation
Downloads
Original
Large
Medium
Small