Figure 2: Tontokrom Target showing planned and drilled hole locations for the Phase 1 drilling program as well as the small scale mining pit (filled with water)

Figure 2: Tontokrom Target showing planned and drilled hole locations for the Phase 1 drilling  program as well as the small scale mining pit (filled with water)

Figure 2: Tontokrom Target showing planned and drilled hole locations for the Phase 1 drilling program as well as the small scale mining pit (filled with water)

Format

JPEG

Source

Asanko Gold Inc

Downloads