Figure 4

201110 Fig 4

Example section for the planned drilling of the La Infanta deposit. A combination of infill and step out drill holes will be required to prepare a mineral resource estimate that meets CIM standards and is compliant with NI 43-101. Note the very high grade intercepts from the historical drilling.

Format

JPEG

Source

Emerita Resources Corp.

Downloads