Figure 3: Bald Mountain map

Appendix B - Figure 3 - Bald Mountain map

A total of approximately 8,150 metres of drilling was completed over six target areas, with a primary focus on building volume for the high-grade Top underground potential resource along with growing the nearby deposits.

Format

PNG

Source

Kinross Gold Corporation

Downloads