GlobeNewswire: Ascot Resources Ltd. Contains the last 10 of 263 releaseshttp://www.globenewswire.com/External?Length=42024-03-29T07:07:52ZGlobeNewswirehttp://www.globenewswire.com/External?Length=4newsdesk@globenewswire.com (NewsDesk)https://www.globenewswire.com/news-release/2024/03/26/2852437/0/en/Ascot-Reports-2023-Annual-Results.html?f=22&fvtc=4&fvtv=39393Ascot Reports 2023 Annual Results2024-03-26T13:10:26Z<![CDATA[VANCOUVER, British Columbia, March 26, 2024 (GLOBE NEWSWIRE) -- Ascot Resources Ltd. (TSX: AOT; OTCQX: AOTVF) (“Ascot” or the “Company”) announces the Company's audited consolidated financial results for the year ended December 31, 2023. For details of the audited consolidated financial statements, Management's Discussion and Analysis, and Annual Information Form for the year ended December 31, 2023, please see the Company's filings on SEDAR+ at www.sedarplus.ca.]]>https://www.globenewswire.com/news-release/2024/02/20/2831884/0/en/Ascot-Provides-Construction-Update-on-the-Premier-Gold-Project.html?f=22&fvtc=4&fvtv=39393Ascot Provides Construction Update on the Premier Gold Project2024-02-20T13:57:22Z<![CDATA[VANCOUVER, British Columbia, Feb. 20, 2024 (GLOBE NEWSWIRE) -- Ascot Resources Ltd. (TSX: AOT; OTCQX: AOTVF) (“Ascot” or the “Company”) is pleased to provide a construction update on the Company’s Premier Gold Project (“PGP” or the “Project”), located on Nisga’a Nation Treaty Lands in the prolific Golden Triangle of northwestern British Columbia. Project construction was 86% complete as of December 31, 2023 (approximately 90% as of January 31, 2024) and is currently nearing completion, with first ore delivery to the mill anticipated by the end of March 2024, and first gold pour anticipated in April.]]>Visible gold in quartz vein found in ore drive 6 at Big MissouriFigure 1TSF overview looking southFigure 2TSF South and Southeast dams completeFigure 3WTP commissioningFigure 4WTP MBBR systemFigure 5Mill piping over 90% completeFigure 6Premier underground portal overheadFigure 7Premier underground portal front viewFigure 8Mill area overviewFigure 9https://www.globenewswire.com/news-release/2024/02/20/2831878/0/en/Ascot-Closes-C-29-Million-Bought-Deal-Financing-and-US-50-Million-in-Additional-Funding-for-Completion-and-Ramp-Up-of-the-Premier-Gold-Project.html?f=22&fvtc=4&fvtv=39393Ascot Closes C$29 Million Bought Deal Financing and US$50 Million in Additional Funding for Completion and Ramp-Up of the Premier Gold Project2024-02-20T13:53:10Z<![CDATA[Not for distribution to U.S. news wire services or dissemination in the United States.]]>https://www.globenewswire.com/news-release/2024/02/09/2826715/0/en/Ascot-Provides-Update-on-Previously-Announced-Financing-Package.html?f=22&fvtc=4&fvtv=39393Ascot Provides Update on Previously Announced Financing Package2024-02-09T12:00:00Z<![CDATA[Not for distribution to U.S. news wire services or dissemination in the United States.]]>https://www.globenewswire.com/news-release/2024/01/22/2813489/0/en/Ascot-Arranges-C-25-Million-Bought-Deal-Financing-and-US-50-Million-Additional-Funding-for-Completion-and-Ramp-Up-of-the-Premier-Gold-Project.html?f=22&fvtc=4&fvtv=39393Ascot Arranges C$25 Million Bought Deal Financing and US$50 Million Additional Funding for Completion and Ramp-Up of the Premier Gold Project2024-01-22T21:26:30Z<![CDATA[Not for distribution to U.S. news wire services or dissemination in the United States.]]>https://www.globenewswire.com/news-release/2024/01/03/2803163/0/en/Ascot-Intercepts-High-Grade-Gold-at-the-Big-Missouri-Deposit-Including-58-2-g-t-Over-2-0-Metres-and-9-9-g-t-Over-6-9-Metres.html?f=22&fvtc=4&fvtv=39393Ascot Intercepts High-Grade Gold at the Big Missouri Deposit, Including 58.2 g/t Over 2.0 Metres and 9.9 g/t Over 6.9 Metres2024-01-03T12:00:00Z<![CDATA[VANCOUVER, British Columbia, Jan. 03, 2024 (GLOBE NEWSWIRE) -- Ascot Resources Ltd. (TSX: AOT; OTCQX: AOTVF) (“Ascot” or the “Company”) is pleased to announce the fourth and final batch of assay results from the 2023 exploration drill program at the Company’s Premier Gold Project (“PGP” or the “project”), located on Nisga’a Nation Treaty Lands in the prolific Golden Triangle of northwestern British Columbia. This release summarizes the final batch of assay results from this season’s surface drilling program for in-fill and exploration purposes at the Big Missouri deposit, approximately six kilometres north of the Premier mill. Underground mine development towards various stoping areas is progressing at Big Missouri, and the stopes targeted in drilling from this release are in the near-term mine plan.]]>3D view of the drill pad locations and drill hole traces reported in this releaseFigure 13D-cross section of drill holes from pad 23BM4. Gold mineralization in the new drill holes shows that the final stope shape will require only minor modifications.Figure 23D-cross section of drill holes from pad 23BM5. High-grade gold was intercepted in between two stope shapes in holes P23-2543 (1 metre grading 10 g/t gold) and P23-2539, suggesting the potential for the stope shapes to expand and be connected.Figure 33D-cross section of drill holes from pads 23BM3, 23BM2 and 23BM6. High-grade gold was intercepted in many areas outside of current stope shapes, such as near-surface to the east of pad 23BM2, or at depth as drilled from pad 23BM6.Figure 4https://www.globenewswire.com/news-release/2023/11/09/2777940/0/en/Ascot-Reports-Third-Quarter-2023-Results-and-Provides-Construction-Update-on-the-Premier-Gold-Project.html?f=22&fvtc=4&fvtv=39393Ascot Reports Third Quarter 2023 Results and Provides Construction Update on the Premier Gold Project2023-11-09T22:00:23Z<![CDATA[VANCOUVER, British Columbia, Nov. 09, 2023 (GLOBE NEWSWIRE) -- Ascot Resources Ltd. (TSX: AOT; OTCQX: AOTVF) (“Ascot” or the “Company”) is pleased to announce the Company’s unaudited financial results for the three and nine months ended September 30, 2023 (“Q3 2023”), and also to provide a construction update on the Company’s Premier Gold Project (“PGP” or the “project”), located on Nisga’a Nation Treaty Lands in the prolific Golden Triangle of northwestern British Columbia. For details of the unaudited condensed interim consolidated financial statements and Management's Discussion and Analysis for the three and nine months ended September 30, 2023, please see the Company’s filings at www.ascotgold.com or on SEDAR+ (www.sedarplus.ca).]]>Premier Portal constructionFigure 1New electrical substation constructionFigure 2New WTP overviewFigure 3New WTP MBBR tanks and electrical buildingFigure 4Process plant interiorFigure 5TSF construction looking northFigure 6TSF spillway liner installationFigure 7TSF north dam liner installationFigure 8https://www.globenewswire.com/news-release/2023/11/03/2773075/0/en/Ascot-Drills-Its-Highest-Grade-Intercept-Since-2015-692-g-t-Gold-Over-0-9-Metres-At-The-Big-Missouri-Deposit.html?f=22&fvtc=4&fvtv=39393Ascot Drills Its Highest-Grade Intercept Since 2015: 692 g/t Gold Over 0.9 Metres At The Big Missouri Deposit2023-11-03T11:00:00Z<![CDATA[VANCOUVER, British Columbia, Nov. 03, 2023 (GLOBE NEWSWIRE) -- Ascot Resources Ltd. (TSX: AOT; OTCQX: AOTVF) (“Ascot” or the “Company”) is pleased to announce the third batch of assay results from the 2023 exploration drill program at the Company’s Premier Gold Project (“PGP” or the “project”), located on Nisga’a Nation Treaty Lands in the prolific Golden Triangle of northwestern British Columbia. This release summarizes the initial batch of assay results from this season’s surface drilling program for in-fill and exploration purposes at the Big Missouri deposit, approximately six kilometres north of the Premier mill. Underground mine development commenced at Big Missouri in 2022, and crews are currently mining and stockpiling mineralized material as development advances.]]>3D view of the drill pad locations and drill hole traces reported in this releaseFigure 13D-cross section of drill holes from pad 23-BM1 drilled in westerly direction. High grade mineralization in hole P23-2484 apparently downfaulted by approximately 2 to 3 metres. The shallow gold intercepts are wireframed but are not included in the current mine plan due to proximity to surface. The Company will consider options for extraction by different mining methods in the future. Two historical holes have been added for further context.Figure 23D-cross section of drill holes from pad 23-BM1 drilled in northerly and southerly/southwesterly direction. Younger dykes obscure zone of gold mineralization at the stope level in holes P23-2485/86. The shallow gold intercepts are wireframed but are not included in the current mine plan due to proximity to surface. The Company will consider options for extraction by different mining methods in the future. Four historical holes have been added for further context.Figure 33D-cross section of drill holes from pad 23-BM2.Figure 4Visible gold in hole P23-2490, with a corresponding assay result of 691.50 g/t gold over 0.9mFigure 5https://www.globenewswire.com/news-release/2023/10/19/2763038/0/en/Ascot-Intercepts-More-High-Grade-Gold-in-the-Prew-Zone-at-the-Premier-Deposit.html?f=22&fvtc=4&fvtv=39393Ascot Intercepts More High-Grade Gold in the Prew Zone at the Premier Deposit2023-10-19T11:00:00Z<![CDATA[VANCOUVER, British Columbia, Oct. 19, 2023 (GLOBE NEWSWIRE) -- Ascot Resources Ltd. (TSX: AOT; OTCQX: AOTVF) (“Ascot” or the “Company”) is pleased to announce the second batch of assay results from the 2023 exploration drill program at the Company’s Premier Gold Project (“PGP” or the “project”), located on Nisga’a Nation Treaty Lands in the prolific Golden Triangle of northwestern British Columbia. These are the final results from surface drilling for in-fill and exploration purposes at the Prew Zone in the Premier deposit, southeast of the Premier mill.]]>3D view of the drill pad locations and drill hole traces reported in this release.Figure 1East looking 3D-cross section showing the drill holes reported in this release, drilled from pad 23PREW1.Figure 2East looking 3D-cross section showing the drill holes reported in this release, drilled from pad 23PREW2.Figure 3Visible gold in hole P23-2480, with a corresponding assay result of 55 g/t gold over 1.0mFigure 4Visible gold in hole P23-2480, with a corresponding assay result of 55 g/t gold over 1.0mFigure 4 cont.https://www.globenewswire.com/news-release/2023/09/19/2745451/0/en/Ascot-Acquires-Assay-Lab-in-Stewart-BC-From-Seacan-Laps-Corp.html?f=22&fvtc=4&fvtv=39393Ascot Acquires Assay Lab in Stewart, BC From Seacan Laps Corp.2023-09-19T11:00:00Z<![CDATA[VANCOUVER, British Columbia, Sept. 19, 2023 (GLOBE NEWSWIRE) -- Ascot Resources Ltd. (TSX: AOT; OTCQX: AOTVF) (“Ascot” or the “Company”) is pleased to announce that it has completed a transaction with Seacan Labs Corp. (“Seacan”) to acquire its full-service assay laboratory facility (“Assay Lab”) in Stewart, British Columbia, located 25 kilometers from the Company’s Premier Gold Project (“PGP” or the “project”). The Assay Lab will be used to perform the testing required by Ascot for mineral exploration, mining operation, and environmental monitoring.]]>Assay Lab in Stewart, BCFigure 1