Highlights
SYDNEY, Australia, Dec. 21, 2018 (GLOBE NEWSWIRE) -- Emerging lithium-boron supplier, ioneer Ltd (ioneer or the Company) (ASX: INR) today announced preliminary drilling results and a maiden Ore Reserve for its 100%-owned Rhyolite Ridge Lithium-Boron Project (Rhyolite Ridge or the Project) in Nevada, USA.
A drilling program comprising approximately 46 holes is being undertaken to upgrade the current lithium-boron (Searlesite) Mineral Resource at Rhyolite Ridge to the Measured category and extend high-grade, shallow mineralisation to the south of the proposed starter pit.
Initial assays have been received from the first nine holes showing:
The Company released its Rhyolite Ridge Pre-Feasibility Study (PFS) on 23 October 2018. The PFS included a two-stage mine development – a starter pit covering the first seven years and an expanded pit covering a mine life of over 30 years.
A maiden Ore Reserve has been estimated for the first stage of mine development:
The Indicated Mineral Resource comprises 950,000 tonnes of lithium carbonate and 7.5 million tonnes of boric acid (inclusive of the Ore Reserve).
Managing Director of ioneer, Mr Bernard Rowe, commented:
“These drilling results extend and further confirm high-grade shallow mineralisation at the Rhyolite Ridge Lithium-Boron Project. The strong boron grades within and to the south of the proposed starter pit are likely to provide stronger cash flow in the early years of the Project.
“With the aim of upgrading the current Mineral Resource and extending the shallow lithium-boron mineralisation further to the south, the three rigs currently on site will continue drilling into 2019.
“This work is a fundamental part of the Rhyolite Ridge Definitive Feasibility Study (DFS), which Fluor Corporation has recently commenced.
“The recently completed PFS demonstrated the Project’s scale, long life and potential to become the lowest cost lithium producer in the world as well as the largest lithium producer in the United States with annual production of 20,200 tonnes of lithium carbonate.”
The highly experienced Fluor team has commenced work on the DFS which is scheduled for completion in Q3 2019. The Rhyolite Ridge Mineral Resources and Ore Reserves are planned to be updated during 2019 as part of the DFS process.
Drilling
The 2018-19 drilling program was designed to upgrade and extend the high-grade portion (Searlesite lithium-boron zone) of the current Indicated and Inferred Mineral Resource of 121.4 million tonnes at 1,740ppm lithium (Li) and 1.26% boron (B).
The current Mineral Resource:
With the gently dipping Searlesite lithium-boron zone averaging 20m in thickness, extensions to the current resource are likely to add significant near-surface tonnes to the south.
Thirty core holes in the 2018-19 drilling program have been completed to date and assay results from nine holes have been received.
The boron grades in the first three years of the PFS mine plan average 1.03% boron (equivalent to 5.9% boric acid). Recent drilling results are likely to materially increase the boric acid grade in the first few years of the starter pit. Each 1% increase in the boric acid grade would provide a revenue increase of approximately US$6/tonne of ore processed (at a boric acid sale price of US$700/tonne). At the PFS base case processing rate of 2.6 million tonnes per annum, each 1% increase in the boric acid grade equates to an additional US$15.6 million of revenue per annum.
The highest lithium grades in the current resource are scheduled to be mined in the early years of the PFS mine plan. The recent drilling has confirmed these strong lithium grades and intercepted near-surface extensions to the south.
Drill hole SBH-58 was drilled to the south of the current Mineral Resource and intercepted 21.3m at 1.08% lithium carbonate and 8.0% boric acid.
Further extending shallow lithium-boron mineralisation to the south has the potential to reduce the strip ratio in the early years of mining. The mining rate in the early years of the project may also be reduced by deferring the need to pre-strip overburden in advance of mining deeper ore.
The table below summarises the assays received to date for the lithium-boron (Searlesite) mineralisation.
Hole Number | Dip/ Azimuth (o) | From (m) | Intercept (m) | ETW (m) | VD (m) | Li (ppm) | Li2CO3 (%) | B (%) | H3BO3 (%) | |||||||||
Infill holes within Starter Pit | ||||||||||||||||||
SBH-43 | -45/0 | 68.6 | 10.7 | 10.6 | 48.5 | 2,206 | 1.17 | 1.31 | 7.5 | |||||||||
SBH-44* | -45/270 | 97.5 | 19.8 | 14.1 | 68.9 | 2,014 | 1.07 | 1.36 | 7.8 | |||||||||
SBH-45* | -45/180 | 112.8 | 42.7 | 30.2 | 79.8 | 2,036 | 1.08 | 1.65 | 9.4 | |||||||||
SBH-48* | -60/180 | 77.7 | 30.5 | 26.8 | 67.3 | 2,214 | 1.18 | 1.47 | 8.4 | |||||||||
SBH-56* | -60/270 | 108.2 | 24.4 | 24.4 | 93.7 | 2,264 | 1.20 | 1.55 | 8.9 | |||||||||
SBH-57* | -60/225 | 106.7 | 33.5 | 33.5 | 92.4 | 2,109 | 1.12 | 1.60 | 9.1 | |||||||||
Infill holes outside of Starter Pit | ||||||||||||||||||
SBH-55* | -45/0 | 268.2 | 32.0 | 22.7 | 189.6 | 1,754 | 0.93 | 1.82 | 10.4 | |||||||||
SBH-59* | -45/45 | 262.1 | 22.9 | 19.9 | 185.3 | 1,771 | 0.94 | 1.99 | 11.4 | |||||||||
Step-out holes outside of current Resource | ||||||||||||||||||
SBH-58 | -45/180 | 149.4 | 21.3 | 18.5 | 105.6 | 2,035 | 1.08 | 1.39 | 8.0 |
* Further assays for these holes are pending.
Notes: Estimated true widths (ETW) are based on dips measured in core and geological interpretation. Vertical depth (VD) is depth from surface to top of lithium-boron mineralisation. Intersections have been calculated by applying a 0.5% B cut-off. Lithium content expressed in ppm or % Li can be converted into Lithium Carbonate (Li2CO3) by multiplying by 5.32 (e.g. – 2,000ppm Li is equivalent to 1.06% LCE). Boron can be converted into boric acid (H3BO3) by multiplying by 5.72 (e.g. 1.81% boron is equivalent to 10.36% boric acid).
Drilling has generally intercepted the lithium-boron zone within 100m of surface. Only SBH-55 and SBH-59 intercepted the lithium-boron mineralisation deeper, due to being located down-dip to the east and outside of the starter pit.
The plan linked below shows the outline of the current Mineral Resource and the location of the hole collars for the current drilling program.
http://www.globenewswire.com/NewsRoom/AttachmentNg/cbdd3279-7490-48b0-844d-36c216541a8b
Ore Reserves
RPMGlobal USA Inc. (RPM) was engaged by ioneer to undertake the mining study for the PFS and to estimate the Ore Reserve.
A conservative approach was taken to the reporting of Ore Reserves at the PFS stage of the Project. To expedite the Project’s development, the operation and associated facilities have been constrained to a maximum surface disturbance of 640 acres or one square mile. This allows the project to be considered for permitting under an Environmental Assessment (EA). Subsequently, a detailed schedule has been prepared for mining an initial portion of the deposit, referred to as the starter pit. This constrained starter pit is scheduled to be mined over approximately seven years; however, the mine life is likely to exceed 30 years when removing this constraint and with the necessary permitting approvals. A mining schedule for the current Indicated Resource outside of the starter pit has not yet been prepared at a sufficient level of detail to enable conversion to an Ore Reserve. Thus, the initial Ore Reserves have been estimated only within the area targeted for the starter pit.
The PFS was completed and released in October 2018, however the supporting documentation for the Ore Reserve estimate was only recently finalised. Key production parameters in the PFS are to:
The initial Ore Reserve is estimated to total 15.8 million tonnes at 1,900ppm lithium (equivalent to 1.0% lithium carbonate) and 12,200ppm boron (equivalent to 7.0% boric acid).
A table accompanying this announcement is available at http://www.globenewswire.com/NewsRoom/AttachmentNg/c9a2a041-ff6f-4dee-b1a1-5a7b5e8d9da5
Notes:
The material moved in the starter quarry totals 107.4 million tonnes, comprised of:
This provides a strip ratio for the starter quarry of 5.8:1.
Summary of Ore Reserve Estimate Parameters and Reporting Criteria
The Ore Reserve is based on the Indicated Resources in the October 2018 Mineral Resource estimate at 1,050ppm lithium and 0.5% boron cut-off, released by ioneer on 23 October 2018. No value was allocated to Inferred Resources which were treated as waste rock.
The host rock for the lithium-boron (searlesite) zone contains low amounts of clay with typically less than 20% carbonate minerals and more than 40% of the sodium borosilicate mineral searlesite. Metallurgical testwork has led to the PFS being predicated on processing the lithium-boron (searlesite) ore and stockpiling the lithium-only mineralisation. For the purposes of the PFS, the process plant feed is mineralisation above a cut-off grade of 0.5% boron.
Study Status
Cut-off Parameters
Mining Factors
Metallurgical Factors
Environment
Costs, Revenue Factors and Economics
The location of the EA starter pit is illustrated in the plan linked below.
http://www.globenewswire.com/NewsRoom/AttachmentNg/9622f34c-dd33-432c-a0e7-3537a66e505a
The Rhyolite Ridge Mineral Resources and Ore Reserves are planned to be updated during 2019 as part of the DFS process.
Contacts
Bernard Rowe | James D. Calaway | Roger Howe |
Managing Director | Chairman | Investor Relations |
T: +61 419 447 280 | T: +1 713 818 1457 | T: +61 405 419 139 |
E: browe@ioneer.com | E: jcalaway@ioneer.com | E: rhowe@ioneer.com |
About ioneer
The Company’s 100%-owned Rhyolite Ridge Lithium-Boron Project in Nevada, USA provides a substantial foundation for ioneer to become a responsible and profitable producer of the materials necessary for a sustainable future.
The Rhyolite Ridge Pre-Feasibility Study demonstrated the Project’s scale, long life and potential to become the lowest cost lithium producer in the world as well as the largest lithium producer in the United States.
With forecast annual production of 20,200 tonnes lithium carbonate and 173,000 tonnes boric acid, Rhyolite Ridge will be a globally significant producer of both lithium and boron.
Lithium and boron are both used in a diverse range of everyday items and innovative technologies that are essential to modern life and emerging clean technologies such as electric vehicles.
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Bernard Rowe, a Competent Person who is a Member of the Australian Institute of Geoscientists. Bernard Rowe is a shareholder, employee and Managing Director of ioneer Ltd. Mr Rowe has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code 2012). Bernard Rowe consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
In respect of Mineral Resources referred to in this report and previously reported by the Company in accordance with JORC Code 2012, the Company confirms that it is not aware of any new information or data that materially affects the information included in the public report titled “Updated Rhyolite Ridge Mineral Resource Statement” dated 23 October 2018 and released on ASX. Further information regarding the Mineral Resource estimate can be found in that report. All material assumptions and technical parameters underpinning the estimates in the report continue to apply and have not materially changed.
The information in this report that relates to Ore Reserves is based on information compiled and reviewed by Mr Igor Bojanic, who is a Fellow of the Australasian Institute of Mining and Metallurgy, and is an employee of RPM Advisory Services Pty Limited. Mr Igor Bojanic has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which, he has undertaken to qualify as a Competent Person, as defined in JORC Code 2012.
In respect of production targets referred to in this report and previously disclosed, the Company confirms that it is not aware of any new information or data that materially affects the information included in the public report titled “Outstanding Results from Rhyolite Ridge Pre-Feasibility” dated 23 October 2018. Further information regarding the production estimates can be found in that report. All material assumptions and technical parameters underpinning the estimates in the report continue to apply and have not materially changed.
Appendix 1 – Location of Drill Holes
Hole Number | Northing | Easting | Elevation (m) | Length (m) | Dip (°) | Azimuth (°) |
SBH-43 | 4,184,601 | 424,159 | 1,859 | 210 | -45 | 0 |
SBH-44 | 4,184,601 | 424,159 | 1,859 | 146 | -45 | 270 |
SBH-45 | 4,184,601 | 424,159 | 1,859 | 165 | -45 | 180 |
SBH-48 | 4,184,582 | 424,316 | 1,875 | 121 | -60 | 180 |
SBH-55 | 4,184,203 | 424,527 | 1,896 | 329 | -45 | 0 |
SBH-56 | 4,184,203 | 424,527 | 1,896 | 155 | -60 | 270 |
SBH-57 | 4,184,203 | 424,527 | 1,896 | 159 | -60 | 225 |
SBH-58 | 4,184,203 | 424,527 | 1,896 | 303 | -45 | 180 |
SBH-59 | 4,184,203 | 424,527 | 1,896 | 305 | -45 | 45 |
Note: Coordinates are in UTM Zone 11 (NAD27).
A map of the project location is available at http://www.globenewswire.com/NewsRoom/AttachmentNg/6778330d-8835-41b5-a330-7b7c3388fabb
Appendix 2 – Mineral Resource Estimates
October 2018 Mineral Resource Estimate (1,050ppm Li Cut-off)
Total Resource including Lithium-Only Mineralisation and
Lithium-Boron (Searlesite) Mineralisation
A table accompanying this announcement is available at http://www.globenewswire.com/NewsRoom/AttachmentNg/59f42ac2-2dcc-4219-964e-41de31905a6c
October 2018 Mineral Resource Estimate (1,050ppm Li & 0.5% B Cut-off Cut-off)
Lithium-Boron (Searlesite) Mineralisation
A table accompanying this announcement is available at http://www.globenewswire.com/NewsRoom/AttachmentNg/59064ab3-3ff4-46fa-a612-6ed2fe068a99
Note: Mineral Resources quoted in this report are inclusive of Ore Reserves.