Status Nabrajah # 8


Nabrajah # 8 drilled ca. 950 meters of Basement. The objective of the production testing is to evaluate a number of zones of interest throughout the basement section identified from wireline logs and shows observed while drilling.
 
The participants in Block 43 are:
 
DNO
56.67 % (Operator)
Oil Search (Yemen) Limited
23.88 %
The Yemen Company
15 % (carried)