Nabrajah # 8 drilled ca. 950 meters of Basement. The objective of the production testing is to evaluate a number of zones of interest throughout the basement section identified from wireline logs and shows observed while drilling.
The participants in Block 43 are:
DNO |
56.67 % (Operator) |
Oil Search (Yemen) Limited |
23.88 % |
The Yemen Company |
15 % (carried) |