Osisko Metals Intersects 16.61% Zinc+Lead Over 6.75 Metres at Pine Point


MONTREAL, Aug. 23, 2018 (GLOBE NEWSWIRE) -- Osisko Metals Incorporated (the “Company” or “Osisko Metals”) (TSX-V: OM; FRANKFURT: OB51) is pleased to announce assay results from 18 drill holes completed in the Central Zone in the Pine Point Mining Camp (“PPMC”). Drill hole M6263-18-PP-014 intersected 14.67% Zinc and 1.94% Lead over 6.75 metres. Hole M6263-18-PP-013 intersected 6.34% Zinc and 1.27% Lead over 15 metres. All intersections are within flat lying tabular-style deposits and all intercepts are located above 82 metre depths. (See 2018 Summer Drill Campaign Central Zone Map).

All reported holes are from the M62/63 deposit that currently measures 1,100 metres in length within the Central Zone. The Central Zone hosts twelve deposits with unclassified historical resources reported by Cominco Ltd. (1988) over a distance of 7.6 kilometres, (including the M62/63 deposit of 789,200 tonnes at 6.7% Zinc and 2.5% Lead). This area is located 11 kilometres to the west of the electrical sub-station along the main haulage road.

Additional highlights are listed below in Table 1 and details are provided in Tables 2 & 3.

Table 1: Selected Drill Highlights

Hole NameAreaHistorical DepositFromToWidthLeadZincLead + Zinc
(metres)(metres)(metres)%%%
M6263 Deposit        
M6263-18-PP-004CentralM62, M6371.7075.203.500.2210.8211.04
M6263-18-PP-006CentralM62, M6376.7080.704.000.427.137.55
M6263-18-PP-007CentralM62, M6369.0073.904.908.681.3410.02
M6263-18-PP-013CentralM62, M6368.5083.5015.001.276.347.60
M6263-18-PP-014CentralM62, M6366.5073.256.751.9414.6716.61
M6263-18-PP-017CentralM62, M6365.8071.525.720.833.814.64
M6263-18-PP-026CentralM62, M6363.0567.904.851.286.317.59

 Note: Lead + zinc grades may not add up exactly due to rounding to 1/100.

Jeff Hussey, President and CEO of Osisko Metals, commented: “We are very excited with the ramp-up of our aggressive summer drill program. The Central Zone drilling continues to confirm the extensive, near surface mineralization that potentially could be mined by open pit methods. We are firmly committed to defining and potentially expanding the project’s historical resources as we convert them into NI 43-101 Mineral Resource Estimates.”

The objective of the 2018 drill program is to upgrade approximately 50 million tonnes of unclassified near-surface historical resources (Cominco Ltd.) to NI43-101 Inferred Mineral Resources as quickly as possible in areas amenable to open pit mining. The 2018 program consists of approximately 700 drill holes (323 now completed) within the Main Trend, a 20-kilometre long, portion of the PPMC that is located on the south shore of Great Slave Lake in the Northwest Territories, near infrastructure and paved highway access and with 100km of haulage roads already in place.

Our next objective is to then convert roughly 30 million tonnes of Inferred Resources to the Indicated Category using the 2018 drilling results. This will then be used as a resource base for future economic studies.

Note regarding historical resource and Qualified Person

The above-mentioned historical resources do not conform to National Instrument 43-101 standards. The Company is reporting the historical estimates for reference purposes only. Neither Osisko Metals nor its consultants have completed sufficient work to verify the historical estimates and these should not be relied upon for investment purposes. A Qualified Person has not done sufficient work to classify the historical estimates as NI43-101 compliant mineral resources and there is no guarantee that such work will allow conversion of such historical resources.

Stanley G. Clemmer, P. Geo registered in the Northwest Territories and is Chief Geologist for Pine Point Mining Limited, a wholly owned subsidiary of Osisko Metals Limited. He is the Qualified Person responsible for the technical data reported in this news release.

Quality Assurance / Quality Control

Osisko Metals adheres to a strict Quality Assurance and Quality Control program with regard to core handling, sampling, transportation of samples and lab analyses. Drill core samples from the Pine Point project area were securely transported to its core facility in Hay River, Northwest Territories where they were logged and sampled. Samples selected for assay were shipped via secure transportation to the ALS Canada Ltd’s preparation facility in Yellowknife. Pulps were analyzed at the ALS Canada Ltd. facility in North Vancouver, British Columbia. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for ultra-trace level detection for a multi-element suite with a 1% upper detection limit for base metals.  Samples reporting over 1% for Zn and 1% for Pb are analyzed by assay grade four acid digestion and ICP-AES analysis with an upper detection limit of 30% and 20% respectively.  Samples reporting Zn >30% and or Pb >20% are analyzed by traditional titration.

Table 2: Composite Assay Results

Hole NameHistorical DepositFromToDrilled WidthTrue WidthLeadZincLead + Zinc
 (metres)(metres)(metres)(metres)%%%
M6263 Deposit 
M6263-18-PP-001M62, M6374.6577.002.352.352.147.379.52
M6263-18-PP-004M62, M6371.7075.203.503.450.2210.8211.04
M6263-18-PP-005M62, M6368.5572.003.453.400.051.131.18
M6263-18-PP-006M62, M6376.7080.704.003.760.427.137.55
M6263-18-PP-006M62, M6376.7087.7011.0010.340.173.503.67
M6263-18-PP-007M62, M6369.0073.904.904.248.681.3410.02
M6263-18-PP-008M62, M6367.3070.002.702.700.172.012.18
M6263-18-PP-009M62, M6380.8582.101.251.232.028.0010.02
M6263-18-PP-010M62, M6373.0074.001.000.870.261.842.10
M6263-18-PP-011M62, M6369.1071.402.302.302.2113.2615.46
M6263-18-PP-013M62, M6368.5083.5015.0013.591.276.347.60
M6263-18-PP-014M62, M6366.5073.256.756.751.9414.6716.61
M6263-18-PP-015M62, M6363.5565.401.851.851.1119.3920.50
M6263-18-PP-016M62, M63    No significant results
M6263-18-PP-017M62, M6365.8071.525.725.720.833.814.64
M6263-18-PP-019M62, M63    No significant results
M6263-18-PP-020M62, M6359.3060.150.850.850.081.501.58
M6263-18-PP-022M62, M63    No significant results
M6263-18-PP-026M62, M6363.0567.904.854.851.286.317.59
M6263-18-PP-026M62, M6378.5079.050.550.550.022.552.57
         

Table 3: Drill hole collar locations (UTM NAD83 zone 11)

Hole NameDepositAreaEastingNorthingElevationAzimuthDipDepth (metres)
M6263-18-PP-001M62, M63Central629409.416744299.25220.43000-90100.50
M6263-18-PP-004M62, M63Central629439.346744345.55220.57105-8090.00
M6263-18-PP-005M62, M63Central629508.986744324.06219.47305-8085.50
M6263-18-PP-006M62, M63Central629534.786744374.60220.36320-70103.00
M6263-18-PP-007M62, M63Central629534.466744375.13220.36280-6099.00
M6263-18-PP-008M62, M63Central629554.936744366.20220.29000-9087.00
M6263-18-PP-009M62, M63Central629581.576744347.84222.57180-80113.00
M6263-18-PP-010M62, M63Central629580.506744347.92222.67115-6090.00
M6263-18-PP-011M62, M63Central629592.806744381.39223.58000-9096.00
M6263-18-PP-013M62, M63Central629574.256744431.52222.11180-6596.00
M6263-18-PP-014M62, M63Central629607.736744407.57223.90000-9096.00
M6263-18-PP-015M62, M63Central629615.996744428.91223.39000-9094.50
M6263-18-PP-016M62, M63Central629629.806744394.87223.17155-70109.50
M6263-18-PP-017M62, M63Central629641.726744412.44223.65000-9095.00
M6263-18-PP-019M62, M63Central629565.146744488.24218.24000-9090.00
M6263-18-PP-020M62, M63Central629602.656744478.72220.03000-9090.00
M6263-18-PP-022M62, M63Central629671.786744395.15223.14000-9095.00
M6263-18-PP-026M62, M63Central629790.566744399.73223.25000-9095.00
         

About Osisko Metals

Osisko Metals is a Canadian exploration and development company creating value in the base metal space with a focus on zinc mineral assets. The Company controls Canada’s two premier zinc mining camps in Canada, namely the Pine Point Camp (“PPMC”) located in the Northwest Territories (22,000 ha) and the Bathurst Mining Camp (“BMC”), located in northern New Brunswick (63,000 ha). The Company is currently drilling in both camps for a combined 100,000 metres.  The focus of these programs is to upgrade historical resources to comply with NI43-101 regulations and also on exploration around historical deposits. Brownfield exploration includes new innovative 3D compilation techniques, updated geological interpretation, and modern geophysics. In Québec, the Company owns 42,000 hectares that cover 12 grass-root zinc targets that will be selectively advanced through exploration. In parallel, Osisko Metals is monitoring several base metal-oriented peers for opportunities.

For further information on Osisko Metals, visit www.osiskometals.com or contact:
Jeff Hussey
President & CEO
Osisko Metals Incorporated
(514) 861-4441
Email: info@osiskometals.com
www.osiskometals.com
Christina Lalli
Director, Investor Relations
Osisko Metals Incorporated
(514) 861-4441
Email: info@osiskometals.com
www.osiskometals.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, the use of proceeds of the Offering; the timing and ability of the Corporation, if at all, to obtain final approval of the Offering from the TSX Venture Exchange; an exemption being available under MI 61-101 and Policy 5.9 of the TSX Venture Exchange from the minority shareholder approval and valuation requirements for each related party transaction; objectives, goals or future plans; statements regarding exploration results and exploration plans. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates; the preliminary nature of metallurgical test results; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of projects; the other risks involved in the mineral exploration and development industry; and those risks set out in the Corporation's public documents filed on SEDAR at www.sedar.com. Although the Corporation believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Corporation disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

A photo accompanying this announcement is available at http://www.globenewswire.com/NewsRoom/AttachmentNg/93379e80-b883-4857-8dbf-b23b08ab5f56

180823 NR_PPMC_Drill_Results